Elko, NV (Minerals) Details
← Back to Nexus Minerals DashboardVisualizations

Full Site System Summary
System Data
Not available
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nullam in dui mauris. Vivamus hendrerit arcu sed erat molestie vehicula.
| Included | Project | Deploy Date | Energy Savings (MMBtu/yr) | Electricity Increase (kWh/yr) | Capital Cost | Carbon Savings (MT/yr) | Annual Cost Savings | ROI (years) |
|---|---|---|---|---|---|---|---|---|
| Heat Recovery Steam Generator (HRSG) and Condensing Economizer | 132,000 | 0 | 7,260 | $708,840 | 2.1 years | |||
| Kiln Insulation and Partial Electrification | 144,375 | 4,230,188 | 7,941 | $487,641 | 1.0 years | |||
| Pre-Dryer MVR Concentrator | 226,875 | 16,785,230 | 12,478 | $76,923 | 32.5 years | |||
| Dryer Exhaust Hot Water Generator | 33,000 | 0 | 1,815 | $177,210 | 6.8 years | |||
| Dryer Electrification with Thermal Storage | 61,875 | 2,702,263 | 3,403 | $148,515 | 10.1 years | |||
| Full Kiln Electrification with Thermal Storage | 226,875 | 13,898,452 | 12,478 | $273,224 | 18.3 years | |||
| Total | 825,000 | $12,200,000 | 45,375 | $1,872,353 | 6.5 years |